Construction – recent and relevant references
Project/Study title | Services delivered | Client | Country |
Ash dry delivery installations from Oltenia Power Holding – Turceni TPP and Craiova II CHPP | Technical Consulting; Basic and Detail Engineering | HOLCIM | RO 2018 |
Cooling towers refurbishment and upgrading – Craiova II CHPP; Slope enhanced stability and over elevation works for the existing ash and slag landfill Jiu – Isalnita, using dens slurry technology | Basic and Detail Engineering | OLTENIA Energy HOLDING | RO 2018 |
Phosphogypsum waste dump – Historically polluted site restoration | Technical and Financial Consulting | AMURCO Bacau | RO 2018 |
Slope over elevation works for the existing ash and slag landfill – Turceni TPP | Basic and Detail Engineering | OLTENIA Energy HOLDING | RO 2018 |
Main infrastructure rehabilitation from Pietroiu Stefan cel Mare Irrigation Plants, Ialomita and Calarasi Counties; Ciorăști Măicănești, Vrancea County; Olt-Călmățu and Viișoarai, Teleorman County; Gostinu – Greaca – Arges, Calarasi County | Technical consulting; Basic and Detail Engineering | NATIONAL AGENCY FOR LAND IMPROVEMENTS | RO 2017 |
Sealed disposal ponds in the slag and ash storage facility | Basic and Detail Engineering | GOVORA CHPP | RO 2017 |
UCC annual report for tracking time behaviour to special and hydro-technical constructions, including slag and ash dumps – Rovinari TPP |
Technical Consulting |
OLTENIA Energy HOLDING |
RO 2017 |
Construction of Biological Mechanical Treatment Plant of Biodegradable Waste in Ploiesti |
Technical Consulting; Basic and Detail Engineering |
STRABAG AG AUSTRIA |
RO 2017 |
Waste Water Treatment Plant extension and construction of Glina Sludge Incinerator |
Basic and Detail Engineering |
SUEZ International |
RO 2017 |
Construction works for existing buildings destination changing on Unit 5 site, during lifetime of Units 1 and 2 in operation and future Units 3 and 4 at Cernavoda NPP, in order to ensure nuclear safety and meet all legal requirements |
Technical consulting; Basic and Detail Engineering |
NUCLEARELECTRICA |
RO 2016 |
Tracking the time behaviour of classical buildings in the Cernavoda NPP |
Technical consulting |
NUCLEARELECTRICA |
RO 2015 |
Reinforcement and Rehabilitation of County Clinical Emergency Hospital in Craiova |
Technical and Financial Consulting; Basic and Detail Engineering |
DOLJ County Council |
RO 2015 |