Power T&D – recent and relevant references
Project/Study title | Services delivered | Client | Country |
400/110/20 kV Smardan electrical substation retrofitting | Basic and detail engineering | ROMELECTRO | RO 2018 |
220 kV electrical substation retrofitting at Hunedoara steel factory | Technical Consulting; Basic and Detail Engineering | ELECTROMONTAJ | RO 2018 |
Multi-Annual Study 2018 – 2020: Ancillary Services Post-Calculation, Transmission Grid and Branches Energy Balances, Energy Loss Forecast | NPS Study | TRANSELECTRICA SA | RO 2018 |
Electricity Distribution | Consulting and engineering | GESTAMP EOLICA DACIA | RO 2018 |
Electricity transmission grid development (2018-2022-2027) | Consulting – NPS Study | TRANSELECTRICA SA | RO 2017 |
Moldova – Romania Power Interconnection Project | Consulting – Feasibility Study; | MOLDELECTRICA / EBRD | MDA 2015-2017 |
400 kV d.c. (1.c.e.) OHTL Constanta Nord-Medgidia Sud | ??? | TRANSELECTRICA – CONSTANTA Branch | RO 2015 |
Upgrading the existing 110 kV substations | Basic and detail engineering | CEZ DISTRIBUTIE | RO 2014 |
Development study for establishing the connection energy producers capacity available for the distribution networks | System study | E.On Moldova Distributie | RO |
Solutions studies for the connection to the medium voltage networks of the NPS of electricity consumers – generators of MV areas | System study | ENEL | RO |