Deva – Paro?eni – Doice?ti – Preparing Clean Coal projects in Romania

Written by dragos on . Posted in Necategorizate

The project target is technical assistance for BERD (as financer of the project) as well as for Termoelectrica (as final Client) for the modernization processes of the three power plants. This modernization program will be carried out by two potential mixed companies between Termoelectrica and private investors and will have two components:

  • component 1 – modernization of Deva and Paro?eni Thermal Power plants;
  • component 2 – replacement of the existent units in Doice?ti thermal power plant with a new unit.

Considering the initiatives of the G8 group at Gleneagles Summit, the Bank has announced its own program of activities related to climate changes. This program will include specific activities in order to help the banks clients in power field for identifying and apply the most adequate rehabilitation and investment programs for improving the performances.

“Preparing Clean Coal Projects in Romania – Deva – Paro?eni – Doice?ti” project will try to help in an easier way, over passing the difficulties associated with the transition process through a developed market economy, where the priority of many energy companies in Romania is simply survival, while increasing competitiveness by increasing energy efficiency and promoting clean production, has gone into the background. For the last few years the power supply fees have been low and they did not allow the recovery of asset investments. As the transition process evolves, this situation is changing, the energy market in Romania now free of any restrictions and the power companies are more and aware of the necessity of increasing power efficiency and reducing all costs.

Though it still exists a bad understanding of the best available techniques or they are bad managed and there is no clear notion of the optimal solution regarding alternative power sources, one example being the dilemma faced by the electric power producers: the rehabilitation of the old power units or construction of new ones.

Services Offered:

The project will have to make an analysis of the units to be rehabilitated and the ones to be replaced, a comparison between them using the best available techniques as defined by the European Union – technical consultancy.

Country and location:

Romania – Paro?eni TPP; Doice?ti TPP; Deva TPP

Client:

Gas natural Fenosa Engineering, Spain

Final beneficiary:

SC TERMOELECTRICA SA

Financer:

BERD

Start / Completion date:

Start designing works: 10 August 2009
Finish designing works: 30 April 2010

LEA 400 kV Arad-Nadab

Written by dragos on . Posted in Necategorizate

Investi?ia este destinat? realiz?rii liniei de 400kV simplu circuit Arad – Nadab ?i include lucr?ri privind protec?ia liniilor de telecomunica?ii ale ROMTELECOM ?i CFR, modific?ri în liniile electrice existente, amenaj?ri de teren pentru execuia si exploatarea liniei, precum si cheltuielile privind desp?gubirile aferente pentru suprafe?ele de teren, care se vor ocupa definitiv ?i temporar.

Realizarea acestei linii va conduce la cre?terea capacit??ii maxime de transport a re?elei de alimentare a zonei Transilvania de Nord cu circa 400 – 500 MW.

Servicii oferite:

  • studiu de pre-fezabilitate (expertizarea liniei)
  • studiu de fezabilitate
  • documentatii pentru ob?inerea avizelor
  • detalii de execu?ie
  • proiect tehnic ?i caiet de sarcini
  • documenta?ie de licita?ie
  • consultan?? ?i asisten?? tehnic?.

?ara si zona de amplasare:

România-Jude?ul Arad.

Data demar?rii/finaliz?rii proiectului (punere în func?iune):

2005-2006/2008.

Numele clientului:

SC TRANSELECTRICA SA-Sucursala Timi?oara.

Firme asociate:

GEOTEC, ISPH, INPTC, ISPCF, TELEROM PROIECT.

OHTL 400 kV Arad – Nadab

Written by dragos on . Posted in Necategorizate

This investment has in view the completion of the 400 kV overhead transmission line, simple circuit, Arad-Nadab and includes projects for the ROMTELECOM and CFR (Railways Company) telecommunication networks protection, land planning and arrangements for the execution and operation of the OHTL, and also compensation costs regarding the temporary & definitively land areas occupation.The completion of this OHTL will lead to the growth of the maximum transmission network capacity in order to supply the Northern part of Transilvania with about 400 – 500 MW.

Supplied services:

  • pre-feasibility study
  • OHTL expert appraisal
  • feasibility study
  • approval documentation
  • basic & detail design
  • bid documents
  • consulting & technical assistance.

Country and location:

Romania – Arad county

Client:

TRANSELECTRICA Timisoara Transmission Subsidiary

Start / Completion date (commissioning):

2005-2006/2008

Associated companies:

GEOTEC, ISPH, INPTC, ISPCF, TELEROM PROIECT

Evaluarea polu?rii istorice la ?antierul Naval Mangalia

Written by dragos on . Posted in Necategorizate

?antierul Naval Mangalia ?i-a început activitatea de produc?ie ?i între?inere a navelor militare în 1953. De-a lungul perioadei de func?ionare a ?antierului naval, mediul a fost afectat prin diversele activit??i industriale operate în incint?. De curând, ?antierul Naval Mangalia, în asociere cu Lurssen Group, au creat societatea Mangalia Naval Systems SRL. Societatea nou creat? a comandat o evaluare a polu?rii istorice pentru partea de propietate pe care o de?ine din fosta incint? a ?antierului Naval Mangalia.

Studiul s-a efectuat conform normei de con?inut ASTM E1903-97 Faza II Evaluare de Mediu a Sitului, HG 1408/2007 ?i con?ine Plan de Ac?iune pentru remedierea mediului afectat.

Activit??ile desf??urate pentru completarea studiului au fost urm?toarele:

  • analiza informa?iilor istorice ?i documentelor existente în rela?ie cu situl investigat;
  • inspec?ie vizual? a sitului pentru stabilirea practicilor ?i împrejur?rilor din trecut care au avut impact asupra mediului;
  • s-au evaluat surse poten?iale de poluare pentru sol, ap? de suprafa??/ap? subteran?, aer, anomalii ale terenului, vegeta?ie stresat?, stocare/întrebuin?are substan?e periculoase, prezen?a azbestului, PCB, plumb;
  • inspec?ie vizual? privind propriet??ile aflate în raza a 500 m, în vecin?tatea sitului;
  • interviuri cu persoanele având cuno?tin?e importante despre sit;
  • întocmire plan de prelevare probe de pe sit ?i supervizare campanie de colectare probe pentru ap?, molu?te, sediment, aer ?i sol;
  • analizare ?i interpretare rezultate ob?inute;
  • s-au estimat zonele afectate;
  • elaborare raport de investigare ?i evaluare a condi?iilor de mediu pentru incinta analizat?.

Servicii oferite:

Consultan?? ?i studiu.

Performan?e tehnice estimate:

S-au estimat zonele afectate din proprietatea Mangalia Naval Systems SRL ?i s-a propus un Plan de Ac?iune pentru remediere.

?ara ?i zona de amplasare:

Intrarea Portului nr. 1, Mangalia, Constan?a, România

Numele clientului:

Mangalia Naval Systems SRL

Data demar?rii / finaliz?rii proiectului:

Data demar?rii lucr?rilor de proiectare: Ianuarie 2009
Data finaliz?rii lucr?rilor de proiectare: Martie 2009

Historical Pollution Assessment of the Mangalia Shipyard

Written by dragos on . Posted in Necategorizate

The Mangalia Shipyard was established in 1953 since when production and services to military vessels has commenced. During the shipyard operation period the environment had been impacted by different industrial activities carried out within its property. Recently the Mangalia Shipyard in association with Lurssen Group established the Mangalia Naval Systems SRL. The new established association ordered an historical pollution assessment for its property, part of the Mangalia Shipyard land in the past.

The assessment was carried out according to ASTM E1903-97 Phase II ESA, GD 1408/2007 and contains an Action Plan to remediate the impacted areas.

The activities carried out to complete the assessment were as follow:

  • review of available historical information and documents pertaining to the site;
  • visual inspection of the site to determine past practices or circumstances that may present environmental concerns;
  • evaluated potential pollutant sources for soil, surface/groundwater, air, surface anomalies, stressed vegetation, storage/handling of hazardous substances, presence of asbestos, PCB, lead;
  • visual inspection of the properties within 500 m of the site;
  • interviewed persons with significant knowledge of the site;
  • elaborated the plan and supervision of the samples collection from the site for water, mussels, sediments, air and soil;
  • analysed and reviewed the obtained results;
  • estimated impacted areas;
  • prepared the investigation and environmental assessment report for the analysed site.

Services offered:

Consultancy and EIA.

Estimated technical performances:

Impacted areas in the property of Mangalia Naval Systems SRL were estimated and an Action Plan for remediation was recommended.

Country and location:

1st Intrarea Portului, Mangalia, Constan?a, Romania

Client:

Mangalia Naval Systems SRL

Start / Completion Date:

Start designing works: January 2009
Finish designing works: March 2009

Modernizarea sta?iei de epurare ape uzate în municipiul Adjud

Written by dragos on . Posted in Necategorizate

S-au prev?zut lucr?rile necesare pentru realizarea sta?iei de epurare a apelor uzate pentru municipiul Adjud.

La dimensionarea sta?iei de epurare s-a ?inut cont de:

  • normativ pentru proiectarea construc?iilor ?i instala?iilor de epurare a apelor uzate or??ene?ti – Indicativ NP 032-1999;
  • num?r locuitori echivalen?i (LE): 26.000;
  • debite caracteristice:
    • Qzimed = 3900 mc/zi;
    • Qzimax = 4680 mc/zi;
    • Qorarmax = 292,5 mc/h;
    • Qorarmin = 49 mc/h;
  • înc?rc?ri specifice per locuitor echivalent (LE):
    • materii solide în suspensie – 70 g/LE ?i zi;
    • CBO5 – 65 g/LE ?i zi;
    • azot total – 11 g/LE ?i zi;
    • fosfor total – 2,5 g/LE ?i zi;
  • parametrii de calitate impu?i de normele existente (NTPA011/2005).

Instala?ia de tratare ape uzate este o sta?ie compact?, care cuprinde:

  • treapt? de epurare mecanic?;
  • treapt? de epurare biologic? cu n?mol activ în care se produc simultan tratamentul secundar ?i ter?iar al apei;
  • treapt? de tratare a n?molului.

Aplicarea solu?iei sta?iei de epurare compacte prezint? urm?toarele avantaje:

  • asigur? gradul de epurare necesar, fiind respectate pe evacuare condi?iile de calitate impuse de normativul NTPA 011-2005;
  • decantare secundar? mult mai eficient? prin instalarea lamelelor;
  • utilizarea pompelor tip air-lift sau pompe de evacuare a n?molului cu ajutorul aerului comprimat, care sunt simple, nu necesit? între?inere ?i sunt foarte fiabile. Aceast? tehnologie asigur? mul?i ani de func?ionare f?r? uzur?;
  • utilizarea unor componente u?or deta?abile precum tuburile de aerare cu membran?, pompele ?i mixerele, permit înlocuirea rapid? a pieselor defecte f?r? a întrerupe func?ionarea sta?ei;
  • datorit? procesului tehnologic performant nu se evacueaz? n?mol în exces, ceea ce conduce la eliminarea costurilor privind tratarea acestuia;
  • toate echipamentele sunt din o?el inox, neexistând probleme generate de ac?iunea apei sau n?molului asupra componentelor;
  • realizarea dezinfec?iei cu ultraviolete în instala?ia de tip UV prezint? avantaj fa?? de solu?ia clorin?rii, cea din urm? variant? conducând la producerea de compu?i toxici în mediul acvatic receptor. Instala?ia de dezinfec?ie asigur? o eficien?? de pân? la 99% privind reducerea coliformilor totali;
  • instalatia de deshidratare namol asigura reducerea volumului ?i condi?iile in vederea transportului ?i depozit?rii;
  • automatizarea instala?iei conduce la siguran?? în exploatare.

Servicii oferite:

Studiu de fezabilitate.

Performan?e tehnice estimate:

În tabelul de mai jos sunt trecu?i principalii indicatori de calitate ai apei uzate la intrarea în sta?ia de epurare si la ie?irea din sta?ia de epurare.

Nr.crt. Indicatori Intrare în sta?ia de epurare Ie?ire din sta?ia de epurare
1 CBO5 65 g/LE ?i zi < 25 mg/l
2 CCO – < 125 mg/l
3 Suspensii totale 70 g/LE ?i zi < 35 mg/l
4 Amoniu – < 3 mg/l
5 Azot total 11 g/LE ?i zi < 15 mg/l
6 Fosfor total 2,5 g/LE ?i zi < 2 mg/l

?ara ?i zona de amplasare:

România, jud. Vrancea, Adjud

Numele clientului:

Prim?ria Municipiului Adjud

Data demar?rii / finaliz?rii proiectului:

Data demar?rii lucr?rilor de proiectare: Martie 2008
Data finaliz?rii lucr?rilor de proiectare: Mai 2008

Paro?eni TPP environment Integrated Permit Documentation

Written by dragos on . Posted in Necategorizate

Paro?eni CHPP is a co-generation unit, which generates thermal and electrical power. For producing thermal and electrical power was analyzed two solutions: rehabilitation of existent steam boilers of 270 t/h and turbines or installation of a new power unit of 150 MW. The adopted and implemented solution was mounting of a new power unit consist of a boiler of 540 t/h and K-160-130-RPR2 turbine and an hot water boiler of 103,2 Gcal/h. This new group will be doted with flue gas desulphurization (FGD).

According to order 818/2003 concerning procedure for emitting of Environment Integrated Permit, article 25, modified and completed by Order no.1158/2005, our institute realized the necessary documentation for obtaining Environment Integrated Permit for Paro?eni CHPP.

Services offered:

Documentation for obtaining Environment Integrated Permit:

  • application form;
  • area (emplacement) report for CET Paro?eni;
  • area (emplacement) report for ash and slug deposits.

Estimated technical performances:

To realize documentation for obtaining Environment Integrated Permit according to environment legislation, was made a carefully analysis of impact on environment factors: water, air, ground, habitations, etc.

For operating according to environment legislation are necessary following requirements:

  • mounting of FGD system for Large Combustion Plant no.2, formed by steam boiler 540 t/h and hot water boiler of 103,2 Gcal/h;
  • installing for evacuation of slag and ash a dense slurry system.

Country and location:

Romania, Hunedoara county, Paro?eni

Client:

“TERMOELECTRICA“ Paro?eni CHPP

Start / Completion date (Commissioning):

Start designing works: March 2006
Finish designing works: March 2007

800MW PPT “Zona Libera Galati”

Written by dragos on . Posted in Necategorizate

At “Zona Libera Galati” (Galati Free Zone) it will be installed a unit of 800 MW with supercritical parameters running on hard coal of approx. 6000 kcal/kg LHV (abt. 25000 kJ/kg) which will discharge the electricity generated to SEN (National Power Grid) through two 400 kV overhead transmission lines. The high voltage line (about 22,5 km) will connect the generating unit to Smardan substation.

„Zona Libera Galati” plant is a greenfield project. The design includes besides the plant proper the achievement of a harbour at the Danube as to supply coal – brought by barges – for the plant (about 2000000 t/year), a trestle for coal conveying belts from the harbour to the plant coal storage, a pumps station on the Danube bank meant to cover the plant demand of cooling water.

The plant will be equipped with installations for pollution reducing (SO2, NOx, powders), lime handling plant, equipment for waste water neutralizing.

Services provided:

ISPE is the partner of Enel – Romania for consulting and engineering activities.
Contracts have been concluded for:
1. Study for power discharging, under two stages.
Stage I included the analysis of several possible alternatives having in view:

  • the normal operating conditions considering n and (n-1) elements under operation, checking the observance of transmission installations capacity and compliance with the admissible range of voltage;
  • to emphasize the installations necessary as to increase the transmission network for each alternative;
  • short-circuit stresses computation;
  • to estimate the investment necessary as to compare alternatives at the client and system;
  • proposed alternative.

Stage II has been prepared after Transelectrica has approved the first stage and has included:

  • stationary conditions with n and (n-1) elements under operation considering SEN is operating interconnected to UCTE;short-circuit stresses computation;
  • static stability conditions analysis;
  • transient stability conditions analysis;
  • safety indices; conditions for framing within SEN (frequency control, voltage control, automation etc.);
  • conditions for framing within operative control, interface with existing SCADA.

For preparing stage II there have been used data made available by Transelectrica related to the transmission network.
2. Environment Impact Assessment study necessary to obtain the environment permit.
3. Preparing documentations necessary to obtain the permits and approvals starting with the urbanism certificate up to the project for construction permit.
4. Pre-feasibility study, feasibility study, permits and execution details for the achievement of double circuit overhead transmission line of 400 kV between the plant and Smardan substation for discharging a power of about 800 MW to SEN (National Power Grid).

Estimated technical performances:

  • Achieving the optimum alternative for 800 MW unit connection to SEN both from technical and unit operating conditions point of view.
  • Setting up technical solutions for achieving the connection to SEN.

Country/location:

Romania – Zona Libera Galati

Client:

Enel Productie Romania

Contracts execution date:

February – November 2008

Central? de 800 MW “ Zona Liber? Gala?i”

Written by dragos on . Posted in Necategorizate

În Zona Liber? Gala?i se va instala un grup de 800 MW cu parametri supercritici, func?ionând pe huil?, cu putere calorifica de cca 6000 kcal/kg (cca 25000 kJ/kg), grup care urmeaz? s? livreze energia electric? produs? în Sistemul Energetic Na?ional prin dou? linii de 400 kV. Linia de înalt? tensiune (cca 22,5 km) va lega grupul generator la sta?ia Smârdan.

Centrala Gala?i Zona Liber? este un proiect greenfield. Proiectul trateaz? în afara centralei propriu-zise ?i realizarea unui port la Dun?re în scopul aprovizion?rii cu c?rbune – adus cu barje – a centralei (cca. 2000000 t/an), o estacad? de benzi pentru transportul c?rbunelui de la port la depozitul de c?rbune al centralei, o sta?ie de pompe pe malul Dun?rii pentru acoperirea necesarului de ap? de r?cire al centralei.

Centrala va fi echipat? cu instala?ii pentru reducerea polu?rii (SO2, NOx, pulberi), gospod?ria de calcar, instala?ii pentru neutralizarea apelor uzate.

Servicii oferite:

ISPE este partenerul Enel – România pentru activit??i de consultan?? ?i inginerie.
Au fost perfectate contracte pentru:

1. Studiul de Evacuare a Puterii în doua faze.
Faza I a comportat o analiza a unui numar de variante posibile din punctul de vedere al:

  • regimului normal de func?ionare considerând n ?i (n-1) elemente în func?iune, cu verificarea respect?rii capacit??ilor instala?iilor de transport ?i a încadr?rii în domeniul admisibil de tensiune;
  • eviden?ierii instala?iilor necesare pentru înt?rirea re?elei de transport în cadrul fiec?rei variante;
  • calculului solicit?rilor la scurt circuit;
  • estim?rii investi?iilor necesare în scopul compar?rii variantelor la beneficiar ?i sistem;
  • variantei propuse.

Faza II s-a elaborat dup? avizarea de c?tre Transelectrica a fazei I a studiului în vederea ob?inerii avizului de racordare la SEN ?i a cuprins:

  • regimuri sta?ionare cu n ?i (n-1) elemente în func?iune, în condi?iile func?ion?rii SEN interconectat în UCTE;
  • calculul solicit?rilor la scurt circuit;
  • analiza condi?iilor de stabilitate static?;
  • analiza condi?iilor de stabilitate tranzitorie;
  • indicatori de siguran??;
  • conditii de încadrare în SEN (reglaj frecven??, reglaj tensiune, automatiz?ri, etc);
  • conditii de încadrare în conducere operativ?, interfa?? cu SCADA existent?.

La elaborarea fazei II au fost folosite date ob?inute de la Transelectrica referitoare la re?eaua de transport.

2. Studiul de impact de mediu în vederea ob?inerii acordului de mediu.
3. Elaborarea documenta?iilor pentru ob?inerea avizelor ?i autoriza?iilor începând cu certificatul de urbanism ?i terminând cu proiectul pentru autoriza?ia de construc?ie.
4. Studiu de prefezabilitate, studiu de fezabilitate, avize ?i detalii de execu?ie pentru realizarea unei LEA dublu circiuit de 400 kV între centrala ?i sta?ia Smârdan pentru evacuarea unei puteri de cca. 800 MW în sistemul energetic na?ional.

Performan?e tehnice estimate:

  • Realizarea variantei optime de racordarea grupului de 800 MW la SEN atât din punct de vedere tehnic, cât ?i a regimurilor de func?ionare a grupului.
  • Stabilirea solu?iilor tehnice de realizare a racord?rii la SEN.

?ara ?i zona de amplasare:

România – Zona Liber? Gala?i

Numele clientului:

Enel Produc?ie România

Data execut?rii contractelor:

Februarie – noiembrie 2008

CTE Br?ila – Grupul energetic de 800 MW

Written by dragos on . Posted in Necategorizate

Consultan?a pentru documentarea consor?iului, format din E.ON Kraftwerke ?i Enel pentru dezvoltarea unui grup de 800 MW, cu parametrii supracritici func?ionând pe huil?, în incinta CTE Br?ila, cu privire la legisla?ia din România în domeniul instala?iilor energetice ?i a avizelor ?i a studiilor necesare pentru promovarea proiectului.
CTE Br?ila a fost realizat? în dou? etape:

  • prima etap?: 3 x 210 MW.
  • a doua etap?: 1 x 330 MW.

Combustibilul folosit: gaze naturale ?i p?cur?.

Proiectul nou cuprinde o serie de lucr?ri de amenajare (demolarea blocurilor 4 ?i 3), desfiin?area unor c?i ferate din incint?, precum ?i proiecte pentru extinderea actualului port de la Dun?re ?i amenajarea lui pentru dec?rcarea c?rbunelui adus pe baraje, pe Dun?re (cca. 2000000 t/an – huil? cu putere calorific? inferioar? de cca. 25000 kJ/kg), estacad? de c?rbune între port ?i depozitul de c?rbune din incint?, instala?ii pentru reducerea polu?rii (SO2, NOx, pulbere), gospod?ria de calcar ?i neutralizarea apelor uzate.

Servicii oferite:

ISPE, al?turi de ERM, este consultantul român al E.ON Kraftwerke pentru dezvoltarea proiectului noului grup de 800 MW.
În cadrul unui contract separat cu E.ON Kraftwerke, ISPE a elaborat studiul pentru evacuarea puterii de 800 MW în Sistemul Energetic Na?ional.

Întocmirea ?i elaborarea documenta?iilor în calitate de consultant pentru:

  • stabilirea pe baz? de modelare a în?l?imii co?ului de fum condi?ionat de concentratiile emisiilor (SO2, NOx, pulberi), ?inându-se seama de grupurile în func?iune din CTE Br?ila ?i de sursele poluante din zon?. Analiza a acoperit o suprafa?? cu raz? de 25 km în jurul viitorului co? al grupului;
  • compilarea avizelor ?i acordurilor a CTE Br?ila, cu referire la datele lor de maturitate, a posibilit??ii lor de extindere;
  • autoriza?iile emise pentru autoriza?iile de construire pentru cele dou? etape de realizare a centralei;
  • autoriza?iile emise de c?tre ANRE pentru evacuarea puterii produse de c?tre grupurile existente;
  • autoriza?iile emise de c?tre organele sanitare pentru func?ionare centralei în condi?ii de siguran?? ?i s?n?tate a personalului centralei, m?surile care trebuiesc luate în cazul unei polu?ri accidentale;
  • cerin?ele obligatorii în conformitate cu legisla?ia din România pentru demolarea unit??ilor nr. 4 ?i 3.

?ara ?i zona de amplasare:

România, jud. Br?ila

Numele clientului ?i al clientului final:

ERM – Germania
E.ON Kraftwerke – Germania

Data realiz?rii contractului:

Iunie – octombrie 2008