Reconstruction of Cogeneration Plant PETROTEL – LUKOIL

Short description:

The investment is necessary as to supply power and heat for the chemical platform Lukoil-Teleajen.
During the first stage it is provided to be erected a power unit - condensation and extraction type - of 32 MW to be supplied initially from the existing boilers; during the second stage it is provided to be erected a steam boiler of 260 t/h – 540o C running on:

The new turbine-generator of 30 MW is located along the existing turbine house 3 x 12 MW, by extending it with 5 bays; the electrical substations required for unit operation are located in the extension of the existing intermediate building.

The reconstruction of the cogeneration plant implies the rehabilitation of existing buildings as well as new buildings:
a) arrangements of existing buildings:

b) new buildings:

The architecture works provided both for existing buildings and for new buildings are meant to create the optimum operation conditions and spaces according to the norms in force concerning emergency situations in case of fire and labor security and health.

 

 

 

 

 

 

Services offered:

Estimated technical performances:

Buildings importance category: B (special) and C (normal)
Buildings importance classes: I and II
Buildings fire hazard category: C, D and E.
Buildings fire resistance degree: II

Country and location:

Romania, Prahova county, Ploiesti town

Client:

S.C. PETROTEL LUKOIL S.A.

Start/Completion date (commissioning):

2006 - project under progress
 