Pagina: 1 2
- 11.04.2011
-
Technical assistance for preparing projects portfolio – District Heating
The Master Plan is the first stage in preparing the Aplication, to achieve investment financed from Cohesion Fund in the Sectoral Operational Program Environment 2007 – 2013 – Priority Axis 3 in the district heating sector.
- 11.08.2009
-
Maternity – exterior section of the county hospital in Buzau city
The building has been designed to have ground floor and 4 floors and a basement and other 5 subsidiary units.
- 07.07.2009
-
Rehabilitation of Ion Creanga area – sector 2 - Bucharest - water
ISPE prepared two projects including:
A. Design of approx. 7 km of sewerage networks and approx. 1.5 km water supply networks for 20 streets in the area Ion Creanga – sector 2 Bucharest.
B. Design of sewerage and water supply networks for 5 streets in the area Ion Creanga – sector 2 Bucharest.
- 06.07.2009
-
Rehabilitation of 15 county hospitals
In order to prepare the Feasibility Studies and the Guide for architectural and engineering Directives for designing, rehabilitation, strengthening where necessary, and “turn key” project for medical equipment in hospitals, as provided in Attachment 1 to Contract it has been also considered the including of departments, divisions and facilities of the hospital, according to Order of Public Health Ministry no. 1764 dated 22 December 2006, with all further modifications.
- 03.07.2009
-
Water and sewerage public networks extension – Bucharest municipality
The project deals with the construction of about 3 Km of water and sewerage networks, on certain streets in district 2 of Bucuresti municipality – (Lopetii, Azuga, Zalau, Declamarii, Hispania, Nicolae Apostol, Simion Busuioc, Sever Popescu Streets).
- 02.07.2009
-
Heat supply strategy for Comanesti Town
The main goal of the documentation was the performance of heat supply strategy for Comanesti Town in compliance with the requirements of the Investments Programme “Termoficare 2006-2009 – quality and efficiency”.
- 01.07.2009
-
„Targului” river improvement - Campulung Muscel municipality area / Arges county
ISPE offered basic engineering, complete topographic and geological studies, detail engineering of the regulation works for the protection of the constructions adjoining the river bed and on site supervision and commissioning.
- 30.06.2009
-
Iasi II CHPP – Modernization of 27 thermal distribution substations
The design is related to the modernization of thermal distribution substation, including process control system, rehabilitation of buildings and of technological, electrical, sanitary and heating installations within Iasi II CHPP.
- 29.06.2009
-
Comparative study on Arad municpality energy strategy
ISPE offered technical, economic and financial consulting services including feasibility study and permitting documentations. The project was aimed to select the solution for the modernization of the district heating system of Arad municipality.
- 26.06.2009
-
Rehabilitation and modernization of heat supply for consumers in the area CT3 -
For the completion of this project ISPE offered:
- Feasibility study.
- Documentation for obtaining approvals.
- Basic and detail design.
- Coordination and approval of works worked-out by sub-contractors.
- Technical assistance at erection and commissioning.
Pagina: 1 2