Case studies

Pagina: 1 2

11.04.2011
Technical assistance for preparing projects portfolio – District Heating

The Master Plan is the first stage in preparing the Aplication, to achieve investment financed from Cohesion Fund in the Sectoral Operational Program Environment 2007 – 2013 – Priority Axis 3 in the district heating sector.

11.08.2009
Maternity – exterior section of the county hospital in Buzau city

The building has been designed to have ground floor and 4 floors and a basement and other 5 subsidiary units. 

07.07.2009
Rehabilitation of Ion Creanga area – sector 2 - Bucharest - water

ISPE prepared two projects including:
A. Design of approx. 7 km of sewerage networks and approx. 1.5 km water supply networks for 20 streets in the area Ion Creanga – sector 2 Bucharest.
B. Design of sewerage and water supply networks for 5 streets in the area Ion Creanga – sector 2 Bucharest.
 

06.07.2009
Rehabilitation of 15 county hospitals

In order to prepare the Feasibility Studies and the Guide for architectural and engineering Directives for designing, rehabilitation, strengthening where necessary, and “turn key” project for medical equipment in hospitals, as provided in Attachment 1 to Contract it has been also considered the including of departments, divisions and facilities of the hospital, according to Order of Public Health Ministry no. 1764 dated 22 December 2006, with all further modifications.

03.07.2009
Water and sewerage public networks extension – Bucharest municipality

The project deals with the construction of about 3 Km of water and sewerage networks, on certain streets in district 2 of   Bucuresti municipality – (Lopetii, Azuga, Zalau, Declamarii, Hispania, Nicolae Apostol, Simion Busuioc, Sever Popescu Streets).

02.07.2009
Heat supply strategy for Comanesti Town

The main goal of the documentation was the performance of heat supply strategy for Comanesti Town in compliance with the requirements of the Investments Programme “Termoficare 2006-2009 – quality and efficiency”.
 

01.07.2009
„Targului” river improvement - Campulung Muscel municipality area / Arges county

ISPE offered basic engineering, complete topographic and geological studies, detail engineering of the regulation works for the protection of the constructions adjoining the river bed and on site supervision and commissioning.

30.06.2009
Iasi II CHPP – Modernization of 27 thermal distribution substations

The design is related to the modernization of thermal distribution substation, including process control system, rehabilitation of buildings and of technological, electrical, sanitary and heating installations within Iasi II CHPP.

29.06.2009
Comparative study on Arad municpality energy strategy

ISPE offered technical, economic and financial consulting services including feasibility study and permitting documentations. The project was aimed to select the solution for the modernization of the district heating system of Arad municipality.

26.06.2009
Rehabilitation and modernization of heat supply for consumers in the area CT3 -

For the completion of this project ISPE offered:
- Feasibility study.
- Documentation for obtaining approvals.
- Basic and detail design.
- Coordination and approval of works worked-out by sub-contractors.
- Technical assistance at erection and commissioning.
 

Pagina: 1 2