Arrangements of the National Power Dispatch Building

Brief description:

The project included endowment with specific furniture and ensuring a proper environment in the NDC`s Control Room, as well as other adjacent rooms such as Training Room, NDC Head Office, Meeting Room, located at the 2-nd floor of NDC building.
Besides the basic requirement, the contract included other additional works of rehabilitation and repair on NDC building.
The necessity of working out under operation of the decoration arrangement and furniture installation, as well as integral keeping of some previous renovation works performed by the client, required using solution of dry installation decoration (wainscoting).
As the Control Room and the adjacent rooms are separated by glass partition walls, the solution is unitary both from decoration point of view and furniture design, necessary for the required purposes.
The NDC`s Control Room is a special place of work with non-stop activity, high responsibility and maximum solicitation in specific events or maneuvers in installations.
Subsequently, the whole environment was designed to be functional, ergonomic and able to ensure a friendly man-equipment interface.
Considering the importance of the objective and the existing modern equipment (EMS/SCADA, PC, VIDEOWALL), the designers aim was to satisfy the operational requirements as well as the esthetic qualities by choosing proper shapes, materials, colors, fabrics used for the room decoration, furniture and accessories.

Services offered:

"Turn key" project (basic & detail engineering and general contractor services)

Estimated technical performances:

 In the NDC`Control Room and the adjacent rooms there were executed the followings:

A. Environment arrangement works:

B. Working out of the specific furniture:

The control desks ensure areas for displays, central units for the process servers, keyboards and mouses, document storage, personnel`s note desk and telephone operator.
The central control desk is provided with areas for printer, intruder survey system and integrated sound system.
ergonomic, adjustable chairs for operators and NDC`s Chief.

C. Mounting of special accessories:

Country and location:

Romania, Bucharest

Client:

National Company for Electricity Transmission Systems "Transelectrica S.A." - National Dispatch Center

Start/Completion date (commissioning):

October, 2002 - December, 2002.

Associated companies:

Erection companies and suppliers:

Furniture and indoor decorations:

MARTIN BAUER ROMANIA
FARGO - DECO DESIGN
ERGO MEX

Floors:

GRIM FLOOR

Visual equipments:

VECTOR INTERNATIONAL

MAGIC SYSTEMS
 

Markets
Download PDF
Permitting
Download video
Information