Case studies

Pagina: 1 2 3

07.07.2010
Scrutinizing the impact of CCS communication on the general and local public

The public acceptance of CCS is an important precondition for the large-scale deployment of these technologies. Now it can be assumed the fact that the most part of the public is neither for, nor against CCS, because the level of knowledge from the public is very low or virtually absent.
 

12.05.2010
Implementation of a new power unit based on modern technologies

Implementing a new power unit with a pulverized lignite combustion boiler, with ultra super critical parameters, based on the latest technologies at European and global level, located on the site of the former stage I, is a key element in the economic policy of both Power Plants.
 

09.07.2009
Historical Pollution Assessment of the Mangalia Shipyard

The Mangalia Shipyard was established in 1953 since when production and services to military vessels has commenced.

09.07.2009
Waste water plant modernization - Adjud municipality

The feasibility study describes the works necessary for the achievement of water water plant of Adjud municipality.

 

08.07.2009
Turceni TPP – Pollution Abatement Project

ISPE is associated with TEPSCO as holder of the contract, and LAHMAYER for the implementation of flue gas desulphurization installations at four units pertaining to Turceni TPP.
 

08.07.2009
Modernization of waste water collecting and treatment system – Ploiesti Municipality

ISPE prepared the basic design and the construction permit design for the modernization of waste collecting and treatment system in Ploiesti Municipality.
 

07.07.2009
Paroseni TPP Environment Integrated Permit documentation

ISPE offered the necessary documentation to obtain the integrated environmental permit for the erection of a new power unit within TPP Paroseni, consisting of a boiler of 540 t/h and K-160-130-RPR2 turbine and a hot water boiler of 103.2 Gcal/h.
 

07.07.2009
Wind farms - Valea Dacilor and Pestera

In Constanţa district there will be assembled in two locations - Valea Dacilor and Pestera – 117 turbines type VESTAS-V100 with a nominal power of 3 MW (in optimal wind conditions).

For this project there are under performance studies about the Environmental Impact Assessment and reports for every location.

In these studies are analyzed positive aspects like environment friendly character, also possible negative aspects concerning noise and biodiversity.


 

06.07.2009
Review of current effects of treatment plant slime use in agriculture

ISPE prepared the feasibility study aimed to analyze the current situation in Romania in terms of treatment plant slime use in agriculture.
 

06.07.2009
“Complexul Energetic” Turceni - Environment Integrated Permit documentation

The documentation performed by ISPE (application for environmental integrated permit issuing, site report for Turceni TPP, site report for ash and slag storages) was prepared in order to obtain an environmental integrated permit. The documentation has the been approved by the client and by the Environmental Protection Agency Gorj county.
 

Pagina: 1 2 3

Markets
Download PDF
Permitting
Download video
Information