- 07.07.2010
-
Scrutinizing the impact of CCS communication on the general and local public
The public acceptance of CCS is an important precondition for the large-scale deployment of these technologies. Now it can be assumed the fact that the most part of the public is neither for, nor against CCS, because the level of knowledge from the public is very low or virtually absent.
- 12.05.2010
-
Implementation of a new power unit based on modern technologies
Implementing a new power unit with a pulverized lignite combustion boiler, with ultra super critical parameters, based on the latest technologies at European and global level, located on the site of the former stage I, is a key element in the economic policy of both Power Plants.
- 09.07.2009
-
Historical Pollution Assessment of the Mangalia Shipyard
The Mangalia Shipyard was established in 1953 since when production and services to military vessels has commenced.
- 09.07.2009
-
Waste water plant modernization - Adjud municipality
The feasibility study describes the works necessary for the achievement of water water plant of Adjud municipality.
- 08.07.2009
-
Turceni TPP – Pollution Abatement Project
ISPE is associated with TEPSCO as holder of the contract, and LAHMAYER for the implementation of flue gas desulphurization installations at four units pertaining to Turceni TPP.
- 08.07.2009
-
Modernization of waste water collecting and treatment system – Ploiesti Municipality
ISPE prepared the basic design and the construction permit design for the modernization of waste collecting and treatment system in Ploiesti Municipality.
- 07.07.2009
-
Paroseni TPP Environment Integrated Permit documentation
ISPE offered the necessary documentation to obtain the integrated environmental permit for the erection of a new power unit within TPP Paroseni, consisting of a boiler of 540 t/h and K-160-130-RPR2 turbine and a hot water boiler of 103.2 Gcal/h.
- 07.07.2009
-
Wind farms - Valea Dacilor and Pestera
In Constanţa district there will be assembled in two locations - Valea Dacilor and Pestera – 117 turbines type VESTAS-V100 with a nominal power of 3 MW (in optimal wind conditions).
For this project there are under performance studies about the Environmental Impact Assessment and reports for every location.
In these studies are analyzed positive aspects like environment friendly character, also possible negative aspects concerning noise and biodiversity.
- 06.07.2009
-
Review of current effects of treatment plant slime use in agriculture
ISPE prepared the feasibility study aimed to analyze the current situation in Romania in terms of treatment plant slime use in agriculture.
- 06.07.2009
-
“Complexul Energetic” Turceni - Environment Integrated Permit documentation
The documentation performed by ISPE (application for environmental integrated permit issuing, site report for Turceni TPP, site report for ash and slag storages) was prepared in order to obtain an environmental integrated permit. The documentation has the been approved by the client and by the Environmental Protection Agency Gorj county.