“Complexul Energetic” Turceni - Environment Integrated Permit documentation
Short description:
Taking into account the need to fulfill in due time the liabilities assumed by Romania within the negotiation process with the European Commission related to chapter 22 "Environmental protection", EC Directive no. 96/61 concerning pollution integrated prevention and control including additional changes has been converted in the governmental ordinance no. 152/2005.
According to the legal provisions in force, "Complexul Energetic" Turceni has to obtain the environment integrated permit both for the thermal power plant and for the ash and slag storages.
Services offered:
The complex documentation includes:
- application for environmental integrated permit issuing.
- site report for Turceni TPP.
- site report for ash and slag storages.
These documents performed by ISPE have been among the first ones performed in order to obtain an environmental integrated permit. The documentation has been approved by the client and in under approval at the Environmental Protection Agency Gorj county (July 2006).
Main technical characteristics:
The activities carried on by "Complexul Energetic" Turceni are the followings:
Large firing installations (IMA):
- IMA 1 including power units no. 1 and 2 having each a thermal power of 789 MWt which will cease operation by 31.12.2006. Due to this reason, this firing installation will be analyzed according to the shut-down procedure and impact assessment will consider this aspect;
- IMA 2 including power units no. 3 and 4 having each a thermal power of 789 MWt;
- IMA 3 including power units no. 5 and 6 having each a thermal power of 789 MWt;
- IMA 4 including power unit no. 7 having each a thermal power of 789 MWt which will operate 20,000 hours during 2008-2015;
- Ash and slag storage no.1 Valea Ceplea;
- Ash and slag storage no.2 stand-by and emergency.
Turceni TPP is a power plant based on block diagram - units no. 37 are each provided with the following equipment:
• one steam boiler of 1035 t/h, 192/48.5 bar, 540/540oC
• one steam turbine of 330 MW, 180.4 bar, 535/535oC
• one electric generator of 330 MW/388 MVA, 24 kV, 50 Hz one electric transformer of 400 MVA, 24/400 kV
Country and location:
Romania, Turceni
Client:
"Complexul Energetic" Turceni
Date of project:
August 2005 - December 2006