Paroseni TPP Environment Integrated Permit documentation

Short description:

Paroseni CHPP is a cogeneration unit, which generate thermal and electrical power.
For producing thermal and electrical power was analyzed two solutions: rehabilitations of existent steam boilers of 270 t/h and turbines or installation of a new power unit of 150 MW. The adopted and implemented solution was mounting of a new power unit consist of a boiler of 540 t/h and K-160-130-RPR2 turbine and an hot water boiler of 103,2 Gcal/h. This new group will be doted with flue gas desulphurization (FGD).

According to order 818/2003 concerning procedure for emitting of Environment Integrated Permit, article 25, modified and completed by Order no.1158/2005, our institute realized the necessary documentation for obtaining Environment Integrated Permit for Paroseni CHPP

Services offered:

Documentation for obtaining Environment Integrated Permit

Estimated technical performances:

To realize documentation for obtaining Environment Integrated Permit according to environment legislation, was made a carefully analysis of impact on environment factors: water, air, ground, habitations, etc.

For operating according to environment legislation are necessary following requirements:

Mounting of FGD system for Large Combustion Plant no.2, formed by steam boiler 540 t/h and hot water boiler of 103,2 Gcal/h;
Installing for evacuation of slag and ash a dense slurry system

Country and location:

Romania – Hunedoara county - Paroşeni

Client:

“TERMOELECTRICA“ Paroseni CHPP

Start / Completion date (commissioning):

March 2006 - March 2007
 