Case studies

Turceni TPP – Pollution Abatement Project

Short description:

ISPE S.A. is associated with TEPSCO as holder of the contract and LAHMAYER for the implementation of flue gases desulphurization installations at 4 units pertaining to Turceni TPP.
The technical solution consists in mounting an absorber on each unit, as well as a of common installation for limestone milk preparing and o the installation for dry gypsum obtaining and storing it in order to use it further on in constructions fields.
Flue gases with high concentration of SO2 (5600 mg/Nm3 at 6% O2 dry), by means of supplementary gas fans are pushed to the absorbers where they react with the limestone milk resulting clean gases that are evacuated by stacks mounted on absorbers and wet gypsum as secondary product which is evacuated to the ash and slag storage or dry gypsum which will be used in constructions.
The entire process is supervised & controlled by a control room common for all 4 units.

Services offered:

Estimated technical performances:

The installation will accomplish:

Estimated economical efficiency:

Country and location:

Romania, Gorj county, Turceni town located at about 50 km N-W of Craiova.

Client:

“Complexul Energetic” Turceni

Start/Completion date (commissioning):

Start date: 01.04.2006
Contract completion date: 01.02.2008
Commissioning for the first two units: until 31.12.2010
 

Markets
Download PDF
Permitting
Download video
Information