Case studies

Implementation of a new power unit based on modern technologies

Short description:

Implementing a new power unit with a pulverized lignite combustion boiler, with ultra super critical parameters – based on the latest technologies at European and global level, located on the site of the former stage I, is a key element in the economic policy of both Power Plants.

The project has the following advantages:

Services offered:

For the implementation of the new 500MW power unit, a turn-key investment project type was taken into consideration. The investment includes the main equipment of the power unit, the auxiliaries’ adaptation (coal, limestone, water treatment etc.) and the connection works to the existing facilities.

Currently, there are two technologies whose development stages are very close to the demonstrative scale: oxi-fuel and post-combustion. Either of these two technologies is appropriate for a highly efficient power unit burning pulverized lignite.
According to the Directive 31/2009/CE of the CO2 storage, new power units with over 300MW, which will be put into operation in the future, must be prepared for implementing the CCS installation ("capture-ready").

The cost-benefit analysis was drawn for the new "capture-ready" group.

Estimated performances:

The attractiveness of implementing CCS will be dictated by the future price of CO2 emission allowances compared to the additional investment and the operating costs of the power plant equipped with CCS installation.

Country and location:

Romania, Gorj and Dolj county

Client:

Complexul Energetic Rovinari
Complexul Energetic Craiova, Isalnita Subsidiary

Start / Completion date:

August 2009 - December 2009
November 2009 - April 2010
 