Short description:

The project aim was the enlargement with one transformer cell of 5 electrical substations in Algeria (primary circuits, secondary circuits, grounding installations).
The 5 electrical substations in Algeria are to be extended as follows:

The substations will be fitted with high performances primary equipment with high electric and mechanical endurance, endowed with surveillance and diagnosis systems that allow faults detection and faults elimination in due time, avoiding, in this way, programmed unavailability.

The provision of such equipment allowed the introduction of an up-to-date system for the substation management which based on sequence commands control connection, disconnection or switch of a cell from one system to another.
The control and protection installations are performed in an integrated control and protection system with a decentralized, distributed, hierarchical architecture.
The system main components are performed with digital equipment.

Supplied services:

Technical specifications for construction and erection works;

Main technical characteristics:

Country/ location:

Algeria, in the neighbourhood of Kerba, El Afroun, Cherchell, Oued Sly and Tennes cities.

Client:

RWE-SAG, Germany

Start date / commissioning:

September, 2004 - March, 2005
 