Case studies

Pagina: 1 2

07.07.2009
Brăila CHPP – 800 MW power unit

ISPE together with ERM is the Romanian consulting company of E.ON Kraftwerke for the development of the project for a new unit of 800 MW.

07.07.2009
800MW PPT “Zona Libera Galati”

ISPE was the partner of Enel – Romania for consulting and engineering activities for a Greenfield project in Galaţi area. The project targeted the installation of a unit of 800 MW.

06.07.2009
Turceni TPP – Rehabilitation and modernization of units no. 3 & 6 (2x330MW)

ISPE offered consulting services for the rehabilitation and modernization works of units no. 3 and 6 within TPP Turceni.

06.07.2009
Modernization of Iasi CHPP for operation optimizing and complying with environmental regulations

ISPE prepared the energy, technological, economic and financial analysis; the main aims of the project being the operation optimizing and complying with the environmental regulations.

03.07.2009
Bucuresti Vest CHPP – extension with modern cogeneration units

ISPE prepared a feasibility study meant to analyze the possibility to install a new cogeneration unit.

03.07.2009
Energy efficiency bankable projects

ISPE prepared the energy, technological, economic and financial analysis; the main aims of the project being the operation optimizing and complying with the environmental regulations.

02.07.2009
Achievement of a new cogeneration unit at Titan CHPP

ISPE, as investor, prepared the feasibility study for the implementation of the „Green/Brown Field” project for a new cogeneration unit based on modern technologies.

02.07.2009
Bucharest-Progresu CHPP – Rehabilitation of process control systems – boilers no. 3 and 4

ISPE provided basic and detail engineering, erection documentation, configuring the images on the operation stations.

01.07.2009
Marketing study regarding the possibilities of SC Termoelectrica units to be competitive on Romanian free energy market in the next five years

ISPE offered consultancy services, consisting in a marketing study, through which it has been evaluated the possibility of each power unit of TERMOELECTRICA to participate on the free Romanian energy market in the next five years.
 

01.07.2009
Turceni TPP - Rehabilitation of Units 4&5 (2 x 330 MW)

ISPE, together with ABB/DBE German Consortium, has offered design services for the rehabilitation of units no. 4 and 5 within TPP Turceni.