Achievement of a new cogeneration unit at Titan CHPP
Short description:
ISPE, as investor, prepared the feasibility study for the „Green/Brown Field” project, consisting in the implementation of a new, high efficiency unit within CHPP Titan, as follows: gas turbine of about 13 MW, and heat recovery hot water boiler of 20 Gcal/h, (out of which 5 Gcal/h supplementary firing). The new cogeneration unit will be located in the available space in the precinct of Titan CHPP which will ensure based on contract the following utilities: softened water, demineralized water, cooling water, fire fighting water, drinking water, taking over of tap and industrial water and will provide a supporting connection in a 6 kV cell.
Services offered:
Feasibility Study including: technical analysis, investment appraisal, economical efficiency analysis, sensibility analysis, general layout, etc.
Estimated technical performances:
- electric power installed (ISO): 13 MW;
- gross electric efficiency: 35.6%;
- fuel consumption of GT: 3800 Ncm/h;
- fuel consumption of heat recovery boiler: 588 Nm3/h.
Annual average performances:
- Heat delivered: 149000Gcal/year.
- Electricity delivered:97333 MWh/an.
Annual fuel consumption:41342 tce/year, out of which:
- Natural gas:40726 tce/year.
- Diesel: 616 tce/year.
Overall efficiency, (in accordance with Directive 2004/8/EC): 80.77%
Primary fuel savings, (in accordance with Directive 2004/8/EC): 15.42%.
Estimated economic efficiency:
Economic efficiency analysis shows that cash flow is positive,during the operating period
- Discount rate: 12%;
- Net Present Value: 1846.015;
- Internal Rate of Return: 15;
- Profitability Index: 1.024;
- Return of investment: 6.3;
- Electricity discount cost: 60.5;
- Heat discount cost: 36.04.
Country and location:
Romania, Bucharest, Titan CHPP
Client:
ENINVEST S.A.
Date of project :
2007