Modernization of Iasi CHPP for operation optimizing and complying with environmental regulations

Short description:

ISPE performed the energy, technological, economic and financial analysis of the project having in view the operation optimization and observance of the environmental program requirements.
The categories of works proposed for Iasi II CHPP modernization are the followings:

Works category I Removal of ash settled on heat exhanging surfaces of 420 t/h steam boiler through chemical cleaning (post-combustion chemical treatment) by means of additives.
The use of cleaning technology during boilers operation leads to the following effects:

Works category II Modernization of electrostatic precipitators pertaining to 420 t/h steam boilers.
The modernization works for the existing electrostatic precipitators includes:

Works category III Modernization of boiler ash and slag removal system and storage compliance with environmental requirements:

Services provided:

Prefeasibility Study, Feasibility Study, Permits documentation

Main technical characteristics:

Estimated technical performances:

Investment technical-economic indices:
Investment total value (without VAT) is 17 217,752 thous. Euro, out of which:

Investment achievement total time is 23 years, and execution effective time of construction-erection works is 54 months.
Specific investment (without VAT) reported to storing capacity (1078800 m3): 11,1 Euro/m3.
Specific investment (without VAT) reported to thermal capacity (2x305 MWt): 28225,8 Euro/MWt.

Country/location:

Romania, Iasi

Client:

Iasi CHPP

Contracts execution date:

2005 - 2028
 