Case studies

Turceni TPP – Rehabilitation and modernization of units no. 3 & 6 (2x330MW)

Short description:

Turceni TPP is the largest Romanian thermal power plant operating on coal.
As to ensure units 3 and 6 operation under reliable and efficiency conditions rehabilitation works are required.

Services offered:

Feasibility study.
Bankable documentation.
Consulting services including:

Main technical characteristics:

Estimated technical performances:

Aims had in view for the two units rehabilitation:

Technical data of the two units foreseen after rehabilitation:

Country and location:

Romania / The plant is located on the right bank of Jiu river, parallel to the national road Craiova-Targu Jiu, at about 4 km distance of Turceni town and at equal distance between Targu Jiu and Craiova towns.

Client:

„Complexul Energetic” Turceni

Services contract time interval:

2004 - july 2008

Start/Completion date:

Unit 3 - 2013
Unit 6 - 2011

Services performed:

Markets
Download PDF
Permitting
Download video