Brăila CHPP – 800 MW power unit

Short description:

Consulting services for the consortium created between e.on Kraftwerke and Enel for the development of 800 MW power unit with supercritical parameters running on hard coal in the precinct of Braila CHPP concerning the Romanian legislation in the field of power facilities and permits and studies necessary to promote the project.
Braila CHPP has been achieved under two stages:

Fuel used: natural gas and fuel oil.

The new design includes several arrangement works (demolition of units 4 and 3), cancelling railways in the precinct as well as designs for the extension of the current harbour at the Danube and its arranging for the unloading of coal brought by barges on the Danube (approx. 2000000 t/year – hard coal of 25000 kJ/kg LHV), coal trestle between harbour and coal storage in the precinct, pollution reducing equipment (SO2, NOx, powder), lime handling plant and waste water neutralizing equipment.

Services provided:

ISPE together with ERM is the Romanian consulting company of e.on Kraftwerke for the development of the project for the new unit of 800 MW.
Based on a separate contract signed with e.on Kraftwerke, ISPE has prepared the study for 800 MW power discharging to SEN (National Power Grid).

Preparing and performing documentations as consultant:

Country/location:

Romania, Braila county

Client and final client:

 ERM - Germany
e.on Kraftwerke - Germany

 Contract performance date:

June - October 2008
 