Case studies

Turceni TPP - Rehabilitation of Units 4&5 (2 x 330 MW)

Short description:

Turceni TPP is the biggest thermal power plant, coal fired, in Romania. The project named "Program A3 - Rehabilitation of Turceni Thermal Power Plant Units 4&5” has been initiated by CONEL (National Power Authority) - Termoelectrica Subsidiary in order to rehabilitate and modernize the power units 4 and 5 rated 330 MW each, runing on lignite. The rehabilitation of units 4 and 5 in Turceni TPP has been made by ISPE together with ABB/DBE German Consortium. The project had in view, based on the examination and inspections made on site, rehabilitation works for 1035 t/h boiler, the turbine and the generator of 330 MW, the thermal-mecganical systems, the electrical systems and the implementation of a new Control System PROCONTROL P type.

Services offered:

As general designer of the plant, ISPE offered the following services related to this project:

Main technical data:

Estimated performances:

The rehabilitation works lead to the growth of the unit availability from 40-50% to 70-80%, to the reduction of the internal consumption and also to the improvement of the total plant efficiency:

Country and location:

Romania, Turceni, Gorj county, at about 50 km from Targu Jiu town

Client:

“Complexul Energetic” Turceni

Start date / completion date:

1995 - 2002 (unit 4); 2006 (unit 5)

Associated companies:

ICPET (Romania)
BABCOCK (Germany)
ABB (Germany)
BTG (Austria)
 