- 07.07.2009
-
Brăila CHPP – 800 MW power unit
ISPE together with ERM is the Romanian consulting company of E.ON Kraftwerke for the development of the project for a new unit of 800 MW.
- 07.07.2009
-
800MW PPT “Zona Libera Galati”
ISPE was the partner of Enel – Romania for consulting and engineering activities for a Greenfield project in Galaţi area. The project targeted the installation of a unit of 800 MW.
- 06.07.2009
-
Turceni TPP – Rehabilitation and modernization of units no. 3 & 6 (2x330MW)
ISPE offered consulting services for the rehabilitation and modernization works of units no. 3 and 6 within TPP Turceni.
- 06.07.2009
-
Modernization of Iasi CHPP for operation optimizing and complying with environmental regulations
ISPE prepared the energy, technological, economic and financial analysis; the main aims of the project being the operation optimizing and complying with the environmental regulations.
- 03.07.2009
-
Bucuresti Vest CHPP – extension with modern cogeneration units
ISPE prepared a feasibility study meant to analyze the possibility to install a new cogeneration unit.
- 03.07.2009
-
Energy efficiency bankable projects
ISPE prepared the energy, technological, economic and financial analysis; the main aims of the project being the operation optimizing and complying with the environmental regulations.
- 02.07.2009
-
Achievement of a new cogeneration unit at Titan CHPP
ISPE, as investor, prepared the feasibility study for the implementation of the „Green/Brown Field” project for a new cogeneration unit based on modern technologies.
- 02.07.2009
-
Bucharest-Progresu CHPP – Rehabilitation of process control systems – boilers no. 3 and 4
ISPE provided basic and detail engineering, erection documentation, configuring the images on the operation stations.
- 01.07.2009
-
Marketing study regarding the possibilities of SC Termoelectrica units to be competitive on Romanian free energy market in the next five years
ISPE offered consultancy services, consisting in a marketing study, through which it has been evaluated the possibility of each power unit of TERMOELECTRICA to participate on the free Romanian energy market in the next five years.
- 01.07.2009
-
Turceni TPP - Rehabilitation of Units 4&5 (2 x 330 MW)
ISPE, together with ABB/DBE German Consortium, has offered design services for the rehabilitation of units no. 4 and 5 within TPP Turceni.